THE NOORWIND EMIRATES SPECIAL OFFER
THE MEGAGIFT IS READY FOR YOU
We talk about an Offshore Platform in the ocean from the FEED to the Start Up, Performance Tuning, and Close Out. This Platform is made of two portions:
- Jacket (Four legs - 50 mts high and 120 mts to add for each pile to hammer and make the jacket stable.)
- Topside (40 x 40, 3 floors plus one: subcellar, Deck, Main Deck, HeliDeck + a connection between Jacket and topside).
We intend ONSHORE as the site in the main land where to make Jaket and Topside. OFFSHORE is where the Jacket first and the topside after will be placed and connected to the underwater piping network or FPSO.
For all of this the reference of all the files is always globally wide. The activities unde consideration are about 4000. The levels from 5 to 6.
- Jacket (Four legs - 50 mts high and 120 mts to add for each pile to hammer and make the jacket stable.)
- Topside (40 x 40, 3 floors plus one: subcellar, Deck, Main Deck, HeliDeck + a connection between Jacket and topside).
We intend ONSHORE as the site in the main land where to make Jaket and Topside. OFFSHORE is where the Jacket first and the topside after will be placed and connected to the underwater piping network or FPSO.
For all of this the reference of all the files is always globally wide. The activities unde consideration are about 4000. The levels from 5 to 6.
The name is NOORWIND EMIRATES NO.1 - There are 8 elements in a folder for a total of 36 megabyte and they will be more compressed using ZIP. You only need to place the zip in a folder and unzip it exactly where you place it.
File Code | File Name | Video Check | Price (USD) |
Zip Folder for listed files | Noorwind Emirate No.1 | N/A | 800,00 USD |
01A | Schedule MSP7.mpp | 0,00 USD | |
01B | Schedule MSP7-P6.mpp | 0,00 USD | |
02A | EPC Calc.xls | 0,00 USD | |
03A | EPC Cabling Dbase.xls | 0,00 USD | |
04A | EPS Piping Dbase.xls | 0,00 USD | |
04B | EPC Test Pkg Piping Dbase.xls | 0,00 USD | |
05A | Systemization.xls | 0,00 USD | |
06A | Constructability.pdf | 0,00 USD |
Total Amount | 800,00 USD |
THE PRICE FOR SUCH
AN ENORMOUS WORK LOAD IS
Now 800,00 USD.
This is why we are talking about a FLASH SALE